December 2025

The Fall 2025 maintenance window coincides with the campus data center generator test and is scheduled for the week of December 15th. HPC@UCD will be bringing servers down on Monday, December 15th, and they will be made available for use after planned maintenance tasks are completed. During this time, Farm, Franklin, and Hive will be unavailable for use, and all jobs will be stopped.

All Clusters

During the maintenance window, the following software items will be updated:

  • CVMFS (Software Module Distribution)
  • Linux Cgroups
  • NVidia GPU drivers
  • Open OnDemand
  • Slurm
  • ZFS

Farm Specific

Farm sells hardware and storage with a five-year guarantee. Many Farm hardware components have exceeded their lifecycle and will be retired during the December 2025 maintenance window. At the request of CAES IT, all hardware more than five years old will be retired, and those Slurm partitions will be removed. Additionally, the partition names for the newer hardware will be renamed.

Farm Slurm Partition Status as of December 15, 2025

Old partition name New Name/Status
high2 high
med2 Deleted
low2 low
high Deleted
med Deleted
low Deleted
bigmemh Deleted
bigmemm Deleted
bigmeml Deleted
bit150h Deleted
ecl243 Deleted
bmh / bmm / bml Untouched
gpul Functionality folded into low. Access with:
--partition=low --gres=gpu:TYPE:COUNT

If you need to start an order for new hardware, see https://hippo.ucdavis.edu/Farm/product/index. Note that there are significant delays in the delivery of computing hardware.

Franklin Specific

Hive Specific